Sunday, 5 June 2011

Adventures in Gearboxes

Made more progress putting the 28 Ariel gearbox together.



Got the front casing fitted as its now repaired. All the gears change now I've assembled it correctly. All studs are present and correct.


Gearbox with the end casing fitted showing the kickstart mechanism and gearchange lever (its a 3 speed handchange Burman Q-box)



I filled the gearbox up with a mixture of moly grease and 50wt oil. You can see one of the gears on the mainshaft and the change mechanism all covered is grease.


Just waiting for some of the painted bits to dry and it should be finished. Next is the engine.

2 comments: